Suspension of use of materials due to renovation work on the 3rd stack area
Renovation work on the 3rd stack will begin in spring 2026. Due to the work, some material in the 3rd stack will be unavailable.
・Suspension period: April 25th, 2026~May 31st, 2027
・Materials to suspension: some materials as follows:
| Type of materials | detail |
|---|---|
| Graduation Theses | Ay~Ayx:25018 ※Graduation Theses numbered Ayx:25019 and above (2015 and later) will be moved to 2nd Stack and will remain available during renovation work. |
| Master’s Theses | ~Ayy:5812 ※Master’s Theses numbered Ayy:5813 and above (2010 and later) will be moved to 2nd Stack and will remain available during renovation work. |
| Credit-earning Theses for doctoral courses | All |
| Special Collection and Classification in right colum | Aikyo, Akimoto, Aoyama, Ishihara, Obase, Kishino, Osaka, Sano, Statistics, Tsuchiya, Yamauchi, Yamanaka, Nikaido, Graduate School, Schumpeter, Moeller, Europe, Ueda, Otsuka, Kan, Toike, Nakauchi, Narumi, Fukasawa, Murase, Muramatsu, Rachi, Carnegie, Spanish Civil War, Bressy, Lexis, Contemporary Eastern European History Materials (Large Books), Umetani, Otomo, Meiji, Gunpai Kumiai (distributor of scrip-purchased commodities) Materials, Kodaira Meiji Collection, Miura, Ito Family Collection, Osogi Mura Town Hall Documents, Securities Reports, IIR Classification Foreign, Open Stack Classification Books, Kunitachi Classification Japanese A |
*If you search the materials in HERMES-Catalog, you will find “*Unavailable due to renovation work (Apr. 25, 2026 -May 31. 2027)” in the comment.
・About Special long-term loans
We will provide special loans for suspended materials. Please see the page “Special long-term loan application form of 3rd stack area materials“.
We apologize and thank you for your cooperation.
